Kasenyi Port Product Improvement

IATI Identifier: KE-RCO-CPR-2009-5689-4204-PORT

Published on IATI
  • date_range Jun 20, 2020 - Dec 20, 2023
  • autorenew Implementation (Status)

Mahagi (DRC)/Goli (UG) is a very busy border crossing located on the axis between the population centres of Arua (UG) and Bunia (DRC) as well as the longer corridor connecting Mombasa Port and Kisangani. At Mahagi, this project will undertake a detailed design and prepare tender documents for a juxtaposed One Stop Border Post facility comprising of roads, parking, warehouses on DRC side and the rehabilitation and modification of existing buildings and parking and small warehouse. The project proposes the most practical and cost-effective way to bring power to the DRC side of the border. This project is being implemented in 2 phases, the first phase being implemented under project code 2203 as part of strategy 1; consists of the construction of the warehouse, public toilets, retaining walls; fencing and drainage of the site. The present project under the project code 4204 is implemented under strategy 2 and consists of the construction of the car park, the works of which were executed in phase 1, and also phase 2 which consists of the construction of the administration building, the retaining wall, the drilling of water and the operationalization of the one-stop border crossing.

more_horiz
Sectors:
  • Trade facilitation

  • Transport policy and administrative management

Participating Organisations

Trademark Africa Regional NGO Implementing

Transaction

Transaction Value Provider
Receiver
Type Date
766,027 USD Provider N/A Receiver N/A Disbursement
date_range Jun 30, 2023
110,327 USD Provider N/A Receiver N/A Disbursement
date_range Mar 31, 2023
398,710 USD Provider N/A Receiver N/A Disbursement
date_range Dec 31, 2022
80,191 USD Provider N/A Receiver N/A Disbursement
date_range Sep 30, 2022
1,318,427 USD Provider N/A Receiver N/A Disbursement
date_range Jun 30, 2022

Budget

2,694,900 USD
  • 968,363 USD (Valued at Jun 30, 2022)
    date_range Apr 01, 2022 - Jun 30, 2022
  • 80,191 USD (Valued at Sep 30, 2022)
    date_range Jul 01, 2022 - Sep 30, 2022
  • 855,584 USD (Valued at Dec 31, 2022)
    date_range Sep 01, 2022 - Dec 31, 2022
  • 619,692 USD (Valued at Mar 31, 2023)
    date_range Jan 01, 2023 - Mar 31, 2023
  • 171,070 USD (Valued at Jun 30, 2023)
    date_range Apr 01, 2023 - Jun 30, 2023
access_time Updated on Sep 22, 2023 12:57:17